Home » NHS urged to plan early to unlock decarbonisation funding

NHS urged to plan early to unlock decarbonisation funding

by BDigital_Admin
Inside a hopsital room

NHS trusts have a significant opportunity to use public funding for low-carbon estate upgrades, but early planning is essential, according to Lichfields.

The planning and development consultancy said the Public Sector Decarbonisation Scheme is supporting projects including heat pumps, solar PV and lower-carbon heating systems, though turning funding into deliverable schemes will depend on early design and planning work.

Phase 4 of the scheme is supporting projects across the 2025/26 to 2027/28 financial years, with more than £816m allocated nationally. Around half of the funding has been awarded to NHS bodies, as the health service works towards becoming the world’s first net zero health service for the emissions it directly controls by 2040.

Energy use across the estate remains a key area of focus, particularly where trusts are retrofitting existing hospital buildings while keeping services running. Many projects will need early planning input, especially where works involve new plant, heat pumps, solar panels, EV charging points or other infrastructure on live hospital sites.

Jonathan Standen, a planning director at Lichfields, said: “Funding through the Public Sector Decarbonisation Scheme is giving NHS trusts the chance to make real progress on lower-carbon estates. The next step is making sure those projects can be delivered smoothly on sites that are often complex, constrained and operational every day.

“Planning is not a barrier to that process, but it does need to be considered early. The right consent route, early engagement with the local planning authority and a clear understanding of site constraints can make a significant difference to how quickly projects move forward.

“For trusts, the strongest position is usually one where the planning strategy is developed alongside the technical and funding work, rather than after the main decisions have already been made.”

The North East has received almost £79m through Phase 4 of the scheme. Around £20m has been awarded to Northumbria Healthcare NHS Foundation Trust to support decarbonisation work across three hospital sites at Wansbeck, Cramlington and Hexham, where existing heating systems are being replaced with ground-source, air-source and water-source heat pumps. Lichfields is advising appointed contractor Dalkia on the planning implications.

At Wansbeck General Hospital in Ashington, Lichfields is also seeking consent for a scheme using ground-source heat pumps to draw on warm water from historic coal workings beneath the hospital, linked to the former Woodhorn Colliery.

Standen said: “The Wansbeck project is a good example of how former industrial infrastructure can be used to support modern healthcare facilities. It also shows why each site needs its own planning strategy. These are not standard projects that can simply be lifted from one estate to another.”

Lichfields previously supported carbon reduction work at North Tyneside Hospital, where a £22m scheme delivered in 2021 reduced CO₂ emissions by 75%, saving around 3,470 tonnes of CO₂ a year and approximately £500,000 in annual energy costs.


Read next: Costain wins place on £700m TfL framework

Are you a building professional? Sign up for a FREE MEMBERSHIP to upload news stories, post job vacancies, and connect with colleagues on our secure social feed.

Leave a Comment

Related News

Online building news, features and opinions

This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. Accept Read More